electricity.cy

Explore electricity charges

Partial, educational breakdown · Domestic tariff 01 · Not a complete EAC bill

Loading current rates; temporarily showing the bundled fallback copy.

Partial / illustrative subtotal with VAT · not your final bill

Fuel applicability, RES contribution and the recorded VAT approval remain unresolved. Even after entering fuel and confirming fixed charges, this is not a complete or officially verified bill.

Fuel adjustment is not included. A verified EAC fuel adjustment rate is not available for this billing period. Your estimated total may differ materially from your actual electricity bill. To include fuel adjustment, enter the revised rate shown on your EAC bill.

If the applicable fuel adjustment is positive, your actual bill may be higher than this estimate. A negative fuel adjustment may reduce the amount.

€187.92

Your billing period

62 days between readings. Dates establish tariff coverage, not fixed-charge allocation.

Fixed charges are not included. The allocation rule for partial or nonstandard periods is not verified; no full charge or daily proration is assumed.

Enter the figure exactly as printed on your bill, in cents per kWh (for example 2.3796; a reduction is entered as a negative number). Manual values are user-supplied, not verified official rates.

Check appliance running costs

Charge breakdown

Electricity generationOfficially verified800 kWh × €0.1789/kWh€143.12
Fuel adjustmentExcluded or unavailableNot included
Network usageOfficially verified800 kWh × €0.0393/kWh€31.44
Meter data managementExcluded or unavailableNot included
Electricity supplyExcluded or unavailableNot included
Public service obligationOfficially verified800 kWh × €0.00051/kWhRate per CERA Decision 407/2024, as published by EAC. Reduced PSO charges for eligible vulnerable consumers are not modelled.€0.41
RES & ES FundAwaiting verification800 kWh × €0.005/kWh€4.00
Components using verified rates · before VAT€174.97
User-entered / unverified assumptions · before VAT€4.00
VATAwaiting verification€178.97 × 5%€8.95
Partial / illustrative subtotal with VAT€187.92

Excluded charges are not treated as zero. This total covers included charges only; the actual bill can be higher.

Not a complete or official EAC bill. Rate status does not verify all charge bases; fuel applicability, RES contribution and VAT approval still need confirmation.

Each charge shows its own status. User-entered and awaiting-verification values remain assumptions, not an official bill.

The primary decree supports 5% VAT for readings 1 May 2026–31 March 2027. As checked on 29 October 2026, the verified-source tariff proposal awaits administrator approval and is not published. This calculator retains the published version’s 5% assumption and awaiting-verification status; source evidence and tariff approval are separate. Official decree K.D.P. 167/2026, paragraph 4

Formulas and charge bases

Energy, included fuel, network, public-service and RES charges = consumption × each applicable €/kWh rate. Meter and supply charges are included only after you confirm a regular two-month bill. Excluded charges do not contribute to this partial total.

Each charge rounds to cents. Subtotal = sum of charges; VAT = subtotal × VAT rate; total = subtotal + VAT. VAT and RES contribution remain awaiting verification.

Applied tariff effective from: 2026-05-01 · VAT assumption: 5%