electricity.cy

Net metering vs net billing

The same solar panel can create very different credits. Understand the unit before comparing savings.

Think in kWh

Net metering matches energy units. Illustration: 800 kWh imported, 1,000 exported and 100 opening credit gives 1,100 available, 800 used and 300 carried forward before any contract-specific expiry. Net energy is zero, but remaining charges are not.

Explore kWh credits

Think in euros

Net billing keeps import costs and export value separate. Illustration only: 1,500 kWh exported at an assumed €0.10/kWh creates €150; €20 opening credit brings the available amount to €170. Separate fixed arithmetic lesson, unrelated to your entries: if a hypothetical €200 eligible amount could be offset by €170, the difference would be €30. This does not establish eligible charges, VAT order, closing credit or forfeiture. No personalized settlement is calculated. The €0.10 is an invented teaching assumption, not an official export rate.

Explore euro credits

Practical difference

Credit unit

Net meteringkWh, not cash

Net billingEuro bill credit, not an automatic cash payment

Imported energy

Net meteringThis model bills energy after export and opening kWh credits

Net billingAll imports are billed before the monetary offset

Exports

Net meteringAdded to available kWh credit in this model

Net billingExported kWh × applicable export price; no default price

Unused credit

Net meteringkWh carry forward; expiry depends on your contract

Net billingEuro surplus carries within the settlement year; the EAC procedure clears it unpaid at final settlement

What remains payable

Net meteringCharge bases depend on verified contract terms; no euro payable is shown

Net billingEligible charges and VAT order need confirmation; personalized payable, closing credit and forfeiture are never calculated

What changes the savings?

  • Generation, shading and when your household uses electricity.
  • Direct self-consumption avoids imports under either scheme.
  • Import price, verified fuel applicability, export price and unused credit expiry.
  • Installation, financing, maintenance and any separately verified grant.
Compare solar sizes

Evidence & limits

EAC section 7 documents the monetary offset, carry-forward and October/November bimonthly settlement, subject to later CERA arrangements. The hosted document is dated 11 May 2022, not a new 2026 rule. Detailed tax treatment and net-metering charge bases remain model assumptions pending confirmation. This comparison does not determine eligibility, current scheme availability or connection approval; check with EAC and your supplier.

Read EAC procedure · pages 6–7Tariff evidence and pending verification